Monday, 13 February 2012

Bridge at 7th

Have lifted old wooden slats off concrete beams and placed a metal bridge on top of the concrete beams.

Thursday, 9 February 2012

Back of 6th green

I have put in stone to stabilise the banking which was being washed away, I have also straighten the the stream & widen it hopefully this will help.

9th pond

I have slope the sides round the pond which will make it easy to maintain, all that's left to do is rake off the stone, add screen soil & seed, that will be done when the grass starts growing.

Path at 15th

The path at 15th which went to the old 16th tee, I have dug up the hardcore and putting in soil, turning it back into grass.

Wednesday, 8 February 2012

Ditch at 4th &10th

I have now v the ditch at 4th, now all the ditch is v, all that is left to do is add screen soil and seed. I do this nearer to the growing season starts. I do the same at the ditch in front of the 10th tee.

Tuesday, 7 February 2012

Trees

I have planted a few trees right hand side of the 3rd, these trees were uplifted from other parts of the course were the plantation are crowed, were as these trees are already at a good height, there are plenty more of these trees so this will be an ongoing program and hopefully they will grow.
I haven't stake the trees just yet but I will do this later, their has been some rabbit damage to the base some of the trees.