I have put sand into it now & it's looking good as you can see the walkway between bunker and were I'm standing was turfed is also coming on nicely.
Thursday, 28 March 2013
Monday, 25 March 2013
Toro units
I have started to strip down regrind cylinder & replace worn out bottom blade with new one, replace any bolts that are worn, & I have replace bushes which I have made new ones up ready to go onto units. Not only bushes I've made up but I have also made some scraper bars the toro never had any so making bars up & fitting them took a bit longer but worth it.
Tuesday, 19 March 2013
Path at 16th
Path at 16th looking from fairway back to tee now been done with 3/4 to dust just requires a roll but that be done when conditions are dry enough.
Friday, 15 March 2013
Greens units
Thursday, 7 March 2013
Digging holes
We are digging holes were water has been sitting & that has damaged the turf, so we are digging through the clay layer & getting into free drain soil I'm hoping this will help dry up these areas but when water levels are high water won't drain away. we are digging down to a depth of about 6ft or more then we be filling them up with drainage material. We then turf them when done so have put a slab on top just for safety.
Friday, 1 March 2013
3rd path
The path washed away after flooding so we have filled it up with rubble then top of with shells, which I trying out
Subscribe to:
Comments (Atom)











