Give an insight of works that are carry out on course.
Monday, 30 January 2012
Bridge at 11th tee
We have lifted off the slabs, the angle I have now taken off.
Their was a lot of weight with the slabs on the bridge this is the reason they where taken off, plus it will be a lot easier for trolleys going over now.
No comments:
Post a Comment